Door-ready adds half the gap between departures — the average wait if your cargo becomes ready at a random moment. On a 42-a-week service that is 0.1 days, and it is the figure a road-versus-rail comparison usually leaves out.
Legs and handovers
A single through leg — no gauge break and no operator handover en route.
- 1 Los Angeles ICTF → Chicago CorwithBNSF · Standard (1435 mm) · 3,300 km · 4 d
Track gauge and borders
The spacing between the rails — whether the wheels can run through, or the load has to change trains.
- Countries crossed
- US
- Gauge changes
- None — through running
- Origin gauge
- Standard (1435 mm)
- Destination gauge
- Standard (1435 mm)
First and last mile
Rail stops at the ramp. The road leg between the ramp and the door is a separate move, priced by the door ZIP rather than by the terminal.
- Pickup to the origin ramp (USLAX) Los Angeles ICTF sits inside the LA/Long Beach complex, so a drayage move to the terminal is a short local run.
No drayage rate service is connected on this deployment, so the road leg cannot be priced here.
rate unavailable
Loading gauge clearance
The height and width of tunnels and bridges — whether the load fits through. A different constraint from track gauge above: this corridor can have no gauge break at all and still refuse a high-cube container.
Set by US, the narrowest network on the route. One restrictive tunnel anywhere caps the whole journey regardless of how generous the rest is. The double-stack envelope. Two high-cube containers only clear it on a well wagon, whose deck sits far below a normal wagon floor — that is the whole point of the design.
- 40ft standard (8'6") on a container flat
- Clears +2401 mm
- High-cube (9'6") on a container flat
- Clears +2096 mm
- Swap body on a container flat
- Clears +2322 mm
- P400 semi-trailer on a pocket wagon
- Clears +1877 mm
Profiles are the published maxima for each network's core freight routes. Individual lines differ in both directions, so a load within 50 mm of the limit needs the operator to confirm the specific path. Compare wagon deck heights →
Emissions
Estimate: transport work × RailScanner’s indicative gCO₂ per tonne-km for the corridor, against an indicative road average — planning figures, not GLEC/ISO 14083 factors and not a regulatory declaration. For compliance reporting, use the certified consignment documentation. Model your own payload with the transit calculator.
The transcontinental double-stack corridor — the highest-volume intermodal relation in North America.